All I need to do now is to copper pipe the connection from the top of the fuel pump to the nozzle, copper pipe from the oulet end of the prop valve back to the inlet to the fuel filter, mend one of my starting routers as the clamp for holding in the socket fixtures I made (earlier in the blog) has bust. I think I need to get a new one! Grrrrr
I have to fit the oil pressure switch and I have a bit of wiring to complete for the fuel pump and temperature control.
It looks like it should now be in the next couple of weeks when I will be properly trying it out.
Oh - I needs to get some fuel too!!
Tuesday, October 02, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment